| CNC Machining or Not: | Not CNC Machining |
| Material Capabilities: | Al, SS, Ti,CoCr,18Ni300 |
| Place of Origin: | Jiangsu China |
| Model Number: | slm 3d printing service |
| Drawing Formats: | 3D(STL/STEP) |
1. What is the electrical configuration to install to power the machine, socket, power supply, electrical safety
•
120 M
Voltage 220V the socket can change local standards
•
water cooling
Voltage 220V
•
powder collector
Link the printer for power supply
2. Slicer software
•
price
$1500/Year,$7000/Life time
•
who does the maintenance
Software company
•
Cost of maintenance and update
The fee includes maintenance and updates.
3. Information on chrome cobalt and titanium powders
•
Heat treatment process for framework and coping/full unit and long bridge
Different powder have different heat treatment powder temperatures.
It is only related to the materials and has no relation to the printed products.
•
Different granulometry offered
15-53μm
•
Photo for marketing
•
Packaging I must personalize
I do not recommend changing the manufacturer's name and logo
Because it involves a certificate.
4. Support disc chrome cobalt and titanium
•
Thickness
20mm
•
Fixing in the machine
Magnetic
•
How many prints to recommend
Recommended printing times: over 200 times; grinding amount: remaining 8-9mm.
•
How to surface after printing
Grinding bed, Hand Grinder
5. Photos and video of the technical parts of the machine
•
Electrical compartment
•
Laser compartment
•
Filtration compartment
not available for now
6. Maintenance after photo and video printing
•
Time for cleaning before reprinting
Cleaning time before reprinting: Clean the forming chamber for ten minutes.
•
Annual maintenance
The permanent filter cartridge requires no maintenance and can print over 20,000 times.
•
Cleaning the powder collector
Permanent filter element does not require cleaning.
•
Water level of the water cooling
Add purified water above green.
7. Surveillance camera information
•
Remote connection to PC and telephone
•
Send a video so that I can check
8. Chrome printing times and quantity cobalt and titanium
•
Framework
7-8
•
Coping and full
80-90
9. how long is the training
•
learn the slicer
•
learn the machine software
•
learn the machine start-up
•
learn the post-processing
•
learn the machine cleaning and collector
•
learn the annual maintenance
About 3 days